
Installing and Connecting Up
67
• On tiled work surfaces, the joints in the area where the hob sits must
be completely filled with grout.
• On natural stone, synthetic stone, or ceramic surfaces, the snap-
action springs can be bonded in place.
• Ensure that the seal is correctly seated in the frame and that it is
seated against the work surface without leaving any gaps. Please do
not apply any additional sealant, this will make removal more diffi-
cult in the event of the need for service.
min. 25
43
3
552 x 482
Kommentare zu diesen Handbüchern